Nature Of Job: Office Fit Out.
Project Location: Ghansoli, Mumbai
Project Description: Supply Installation and testing of Toshiba VRF conditioning system along with low side works Which include refrigerant piping, electrical work,ducting, insulation, grilles Diffuser other air terminal . The project is executed on 15TH Floor of Rupa solitaire mahape new mumbai.
The project consist of VRF system of 144 H.P and air is conditioned by means of cassette unit each individual cassette are provide with fresh air port in door to maintain the fresh air level in room the total area occupied by project is around 27500 sq ft .
Installed Capacity : 144 HP
Area : 27500Sqft
Job value: 87Lakhs.
Architect :DWP interics Pvt Ltd
Project ana
Job Status: Completed and Handed over in 2014
]]>Nature Of Job: Office Fit Out.
Project Location: Andheri , Mumbai
Project Description: Supply Installation and testing of Toshiba VRF conditioning system along with low side works Which include refrigerant piping, electrical work, ducting, insulation, grilles and other air terminal
Installed Capacity: 350 HP
Area : 55000 Sqft
Job value :250 Lakhs.
Architect : M/s Sankapan Architects Pvt Ltd.
HVAC Consultant : M/s Umesh Thamke Engineers
Project Management: M/s Turner & Brown
Job Status: Completed and Handed over in 2015
]]>Nature Of Job: Commercial Offices
Project Location: Kandivali, Mumbai
Project Description: Supply Installation and testing of Toshiba VRF conditioning system along with low side works Which include refrigerant piping, electrical work, ducting, insulation, grilles and other air terminal
The entire building consists of 8 floors and houses data centre for Mahindra Group .
Installed Capacity : 350 HP
Area : 72000 Sqft
Job value : 150 lakhs.
Architect : Vam Infrastructure Pvt Ltd
HVAC Consultant : T.V Hariharan
]]>Nature Of Job: Office Fit Out.
Project Location: Lower Parel, Mumbai
Project Description: Supply Installation and testing of Toshiba VRF conditioning system along with low side works Which include refrigerant piping, electrical work,ducting, insulation, grilles Diffuser other air terminal . The project is executed on 14 th floor to 21 st floor at Marathon Futurex , Lower Parel
This is Zee new corporate office along with 4 recording studio .
Installed Capacity: 1000 HP
Area : 2,00,000 Sqft
Job value:800 Lakhs.
Architect : DSP Design Associate PVT LTD
HVAC Consultant : Jay Consulting Engineers
Job Status: Completed and Handed over in 2016
]]>Nature Of Job: Commercial Offices
Project Location:Andheri, Mumbai
Project Description: Supply Installation and testing of Toshiba VRF conditioning system along with low side works Which include refrigerant piping, electrical work,ducting, insulation, grilles Diffuser other air terminal.
Project consist of G+ 5 Floors located at SEEPZ ,Mumbai .
Installed Capacity:300HP
Area :60000 Sqft
Architect :Manoj Patel Associates
Job Status: Completed and Handed over in 2011
]]>